BIOETHANOL PRODUCTION FACILITY
Goświnowice
28 technological installations over an area
of 11 ha
Installed power 12,8 MVA
Delivery and assembly:
8x1,6 MVA transformers
MV 8HD10 switchgear
LV 3200A distribution boards from LV1 to LV7
PROJEKTLISTEN - LISTE DER DURCHGEFÜHRTEN PROJEKTE
Europa
WIND FARM
Łęki Dukielskie
Installed power 10 MW
Installation of 15 kV internal connections
Installation of 5 transformer stations
Connection to National Grid
THERMAL-ELECTRIC POWER PLANT at
PCC ROKITA
Brzeg Dolny
Design and modernization
Power station equipped with:
Two boilers
17,5 MVA/6,3 kV generator
LV switchgears 22 cubicles, 2 ATSE, 2500 A
Main MV switchgear
NGK CERAMICS
Gliwice
Installation of five 3150 kVA transformers
with Siemens 5000 A busbars
Installation of four 2500 kVA transformers
with Siemens 4000 A busbars
Installation of one 1600 kVA transformers
with Siemens 2500 A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units
of LV Sivacon 5000 A
KIRCHHOFF Polska Ltd. ASSEMBLY, Gliwice
Plant No. 1, 2, 3 and power suplly
Installation of two 2500 kVA transformers
with Siemens 4000A busbars
Installation of five1600 kVA transformers
with Siemens 2500A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units
of LV Sivacon 5000 A
Toyota Foundry with accompanying
ACCUROMM and NTK facilities, Jelcz Laskowice
Installation of six 2000 kVA transformers
with Siemens 5000A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units
of LV Sivacon 5000 A
Nord- und Süd Amerika,
Australien
TP-Elbud GmbH
Gewerbering 6
02828 Görlitz
Tel.
+49 (0) 3581 429749-0
Fax: +49 (0) 3581 429749-2
E-Mail:
thomas.lachenmann@tpelbud.de
buero@tp-elbud.de
Homepage designed by www.wimeta.de
Afrika, Mittlerer Osten
und Asien